- Landfill Capping (incl. installation of geosynthetic liners)
- Landfill Cap Maintenance
- Erosion Control Measures
- Secondary Containment for Storage of Petroleum and Hazardous Materials
- Stormwater Management Structures
- Trenching & Pipe Installation for Remediation Systems
- Surface Impoundment/Lagoon Construction & Maintenance
- Dewatering of Lagoons & Excavations (for direct discharge or containment for treatment)
- Drum Excavation and Remedial Measures
- Site Restoration